We are anticipating a railing replacement project on property this fall/winter season.  The start date has not yet been set in stone but we think the earliest would be after the New Year’s holiday (There will be no work from December 20th through January 1st).  The railings on the walkways will be replaced first.  Work hours will be 8am – 6pm, Monday through Friday.  There will be no work at night or on the weekends.  Some noise is expected, but we will work in sections to keep the work from disturbing as much as possible.  We do not expect this to be a major disruption to our regular agenda of relaxing, unwinding and enjoying all there is here at the beach.   Most likely, we will be working on balconies in January.  Balcony work should keep the work more contained to specific condos.  While we don’t yet have all the details on this upcoming project, we will always do our best to make sure you stay is enjoyable!

UPDATE: AS OF 1/18/19 ~ We have installed a majority of the walkway railing and have all the balcony rails installed with the exception of 2 (condo #417 and condo #213).  We still have plenty of work remaining on our railing project:  all of our stairs, the remainder of the walkways, flower beds and parking lot are still left to be installed.  The noise has been pretty loud during the day, however now that the balcony work has pretty much been completed, we don’t anticipate the interruptions in the rooms to be as prevalent.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *